How to choose a crane

Four facts decide the crane type: the heaviest load and how it is lifted, the building (a runway on its structure or not), how many hours and how close to capacity the crane works, and the atmosphere, from outdoor weather to heat or explosive gas and dust. Answer those and the type follows.

Founded 2004In-house manufacturingEN · FEM · ISO designCE marked2,500+ cranes installed

Which crane type do you need?

Five questions, in order. Stop at the first one that gives you an answer.

  1. Is the atmosphere explosive? Gas or vapour (Zone 1 or 2) or combustible dust (Zone 21 or 22): start with an explosion-protected crane. The rest of the questions still apply, inside that frame.
  2. Does the crane serve one workstation or the whole area? One machine, one loading point: a jib crane, or a wall-mounted jib crane where a column fixes it to the building. A long line of stations along one wall: a wall-travelling jib crane. The whole floor: go to question 3.
  3. Can the building carry a runway? Yes, on both sides: an overhead crane (question 4). On one side only: a semi-gantry crane. No, or the work is outdoors: a gantry crane. A fixed line rather than an area: a monorail system.
  4. How heavy, how wide, how often? Lighter loads and moderate spans: a single girder overhead crane. Heavier loads, longer spans, the longest hook path, a cab or a walkway on the crane: a double girder overhead crane.
  5. Is the crane part of the process? Ladle handling, charging, round-the-clock production cycles, heat: a process crane, designed together with the process it serves. Repeated positioning in a line or a store: an automated crane system.

Two answers can be right at once. A plant often needs an overhead crane for the hall and jib cranes at the machines.

Six things that decide the crane

1. Load and how it is lifted

Start from the heaviest load, then add everything hanging under the hook: lifting beam, spreader, C-hook, ladle. That total is the capacity the crane is sized for. Our standard selection runs from 250 kg to 160 t; above 160 t we engineer per project.

2. Span and runway

Span is the distance between the two runway rails. It decides girder size, and with it the single or double girder choice. Our double girder cranes reach 32 m at 100 t as standard, single girder cranes 30 m; longer spans are engineered as special projects. Check the columns and the building structure early: the wheel and foundation loads the crane transfers are calculated and issued per project.

3. Lifting height and headroom

Lifting height is how far the hook travels. Headroom is the space between the top of the runway rail and the roof. Low headroom points to an underhung or side-mounted hoist on a single girder crane; the longest hook path, up to 30 m, comes with a double girder crane.

4. How hard the crane works — duty class

Two cranes with the same capacity can have very different lives: one lifts twice a day, the other close to capacity on three shifts. Duty class captures that, as a FEM class (1Bm to 5m) or an ISO class (M3 to M8). A class set too low wears the mechanism early; a class set too high costs weight and money. The duty class guide explains how the class is set.

5. The atmosphere

  • Outdoor: wind, rain and temperature; our standard range is −10 to +50 °C, outside it per project.
  • Heat: foundries and melting plants need heat-shielded components and a process crane.
  • Dust or corrosion: enclosure rating, paint system and material choice change.
  • Explosive gas or dust: an explosion-protected crane for gas Zone 1–2 or dust Zone 21–22, certified per project by a notified body.

6. Cost over the crane's working life

The purchase price is one part. Energy, maintenance, spare parts and the cost of a stopped line add up over the years. Inverter drives, the right duty class and an annual maintenance contract keep that total down. If an existing crane is the problem, modernising an existing crane can be the better answer than a new one.

Crane types compared

TypeCarried byStandard capacityStandard span / reachTypical use
Single girder overhead craneRunway on the building250 kg – 12 t30 mGeneral manufacturing, assembly, stores
Double girder overhead craneRunway on the building250 kg – 160 t32 m at 100 tHeavy loads, long hook path, cab or walkway
Gantry craneIts own legs on floor rails12 t single · 160 t double32 mOutdoor yards, halls without runway structure
Semi-gantry craneOne runway, one leg12 t single · 160 t double32 mBuildings that carry a runway on one side only
Jib craneIts own column250 kg – 5 t2.5 – 5 m armOne machine or loading point
Wall-mounted jib craneA building column or wallPer project180° slewWorkstations along the structure
Wall-travelling jib craneA runway on the wallPer projectPer projectA line of stations under a main crane
Monorail systemA fixed beamUp to 12 tFollows the routeFixed transfer routes, lines
Process craneRunway on the buildingPer projectPer projectLadle handling, charging, continuous duty
Explosion-protected craneAny of the abovePer projectPer projectGas Zone 1–2, dust Zone 21–22

Values are our standard selection. Larger capacities and spans are engineered per project. Duty classes from FEM 1Bm to 5m (ISO M3 to M8) across the range.

Four plants, four answers

A machining hall, 8 t, 22 m span, one shift. A single girder overhead crane covers the hall. Jib cranes at the two heaviest machines take the short lifts off the main crane.

A steel stockyard outdoors, no building structure. A double girder gantry crane on floor rails, with the outdoor temperature range and wind load in the calculation.

A hall whose side wall cannot carry a runway. A semi-gantry crane: a runway on the strong side, a leg on a floor rail on the other.

A paint mixing room classified as Zone 1. An explosion-protected crane. Hoist, motors, brakes and controls are selected and certified for the zone, as one system.

Not sure yet?

Send us the load, span, lifting height, the hours the crane works and a photo or drawing of the building. Our engineering team works through the six points with you and tells you which type fits, including when a smaller or simpler crane is enough.

FAQ

Frequently asked questions

What capacity crane do I need?

Add the heaviest load and everything hanging under the hook: lifting beam, spreader or ladle. That total is the capacity. Leave margin only where the load itself may grow; oversizing adds weight and cost to the crane and the building.

Single girder or double girder?

Single girder suits lighter loads and moderate spans and puts less load on the building. Double girder takes heavier loads, longer spans and the longest hook path, and it carries a cab or a walkway. Our single girder cranes run to 12 t and double girder cranes to 160 t as a standard selection; above that we engineer per project.

Overhead crane or gantry crane?

If the building can carry a runway, an overhead crane leaves the floor free. If it cannot, or the work is outdoors, a gantry crane runs on its own legs and floor rails. A semi-gantry crane covers the case where only one side can carry a runway.

Jib crane or overhead crane?

A jib crane serves one point: a machine, a loading station. An overhead crane covers the whole area. Many plants use both, with jib cranes taking the short, frequent lifts.

What changes in an explosive atmosphere?

Every electrical and mechanical component that could ignite the atmosphere is selected for the zone: gas Zone 1–2 or dust Zone 21–22. The crane is certified per project by a notified body. Gas group and temperature class are defined per project.

Get in touch

Tell us about the lift

Send the load, span and working conditions. Our engineering team replies with the questions that matter for your plant.

Or call 444 8 440

Request a quote

Your details are used only to answer your request